
Plan complex lifts and follow the plan. Install and operate lifting equipment on stable ground and use cranes with devices that detect the potential for overload. Separate and protect personnel from lifting equipment and loads.
• Categorise all lifts based on the level of risk present, and have lift plans for each category that are appropriate to the level of risk. • Have a single-point of accountability (SPA) assigned for all lifts and clearly define the SPA roles and
Lift Engineering Specialist (LES) The LES provides technical overview and guidance for lifts (typically only the most critical lifts requiring an Engineering Lift Study), if requested. The LES can provide the following:
financial risk and exposure of BHP Billiton. Using recognised standards, risks have been defined as tolerable and intolerable. Intolerable risks require mandatory mitigation or control within the Draft EIS process, while tolerable risks are those that require further mitigation and control through the BHP Billiton management systems.
BHP-RISK ASSESSMENT - DALF R1 | PPT - SlideShare
Jan 24, 2016 · This document provides a hazard identification and risk assessment for rig-up/rig-down and operation of a Bail Assembly Spreader System (BASS), Dual Articulating Lift Frame (DALF), Hydraulic Power Unit (HPU), and handling equipment and mini track.
Crane Lifting Plan - My Safety Works
This crane lifting plan can be used to assess high risk lifts such as: Multiple crane lifts, i.e. where more than one crane is used to lift a load at the same time. Lifting of workboxes (or personnel safety cages) with persons in the boxes.
Bhp Lift Study Section F Offers over 60,000 free eBooks, including many classics that are in the public domain. Open Library: Provides access to over 1 million free eBooks, including classic literature and contemporary works.
Why Crane Lift Studies are Required - Membrey’s
Dec 11, 2020 · A proper crane lift study will provide you with a visual representation of what you’re planning. It will cover setup and configuration of the crane, as well as where it needs to travel. It also covers details about rigging and ground bearing pressure.
Lift Study Center and Engineering - Fleurieu Cranes
Fleurieu Cranes provide a dedicated Lift Study Centre to help identify and assist your project. Our team of engineers and back office support staff are able to develop project specific Lift Studies with the greatest level of accuracy.
Safety - BHP
BHP’s Our Charter value of Sustainability articulates safety as fundamental to the way we conduct our business, Do What’s Right, Seek Better Ways, Make a Difference. The safety of our people and the communities where we operate must always come first.
- Some results have been removed