
Congo River | DEME Group
* this hopper can be equipped with the D.R.A.C.U.L.A.® system. Media. Similar equipment
TSHD Congo River - Wikipedia
Trailing Suction Hopper Dredger Congo River is the newest ship of the DEME fleet with the biggest hopper capacity: 30,190 m 3. DEME N.V. signed a contract with IHC Dredgers B.V. for …
Ship CONGO RIVER (Hopper Dredger) Registered in Belgium
Discover the vessel's particulars, including capacity, machinery, photos and ownership. Get the details of the current Voyage of CONGO RIVER including Position, Port Calls, Destination, …
Congo River - Trailing suction hopper dredgers - Dredgepoint
tradition of DEME NV to name some of its large ships after the world’s great rivers. The CONGO RIVER is an innovative and versatile vessel, which has excellent manoeuvrability and is also …
The Netherlands: DEME and Congo - Dredging Today
Jan 22, 2011 · Late afternoon today, DEME’s new 30,000 m³ mega trailing suction hopper dredger ‘Congo River’ was launched at the shipyard of IHC Merwede in Krimpen aan den …
DEME, ICTSI Sign Congo River Dredging Deal
Jul 10, 2017 · International Container Terminal Services Inc. (ICTSI) and the Belgium based Dredging International (DEME Group) have signed a Memorandum of Understanding (MOU) …
Royal Highness Princess Astrid visits DEME's TSHD Congo River …
Mar 8, 2025 · The giant Congo River, the largest hopper in the DEME fleet, is carrying out dredging works in Mumbai.
CONGO RIVER, Hopper Dredger - Details and current position
The vessel CONGO RIVER (IMO 9574523, MMSI 253688000) is a Hopper Dredger built in 2011 (13 years old) and currently sailing under the flag of Luxembourg.
Congo River (schip, 2011) - Wikipedia
Congo River is een sleephopperzuiger van het Belgische baggerbedrijf DEME. In december 2008 tekende DEME en IHC Dredgers BV, onderdeel van IHC Merwede, het contract voor het …
DEME expands dredging activities in Africa with three new contracts
Nov 16, 2023 · Deploying a cutter suction dredger and hopper dredger, the Grand-Lahou coastal protection works will start in Q2 2024, and will take approximately one year to complete. Benin …
- Some results have been removed